ACTION: C.6:

Elimination of illegal waste dumps, transportation of communal waste off the site.

The aim of the action is reaching and keeping an ecologically stable condition of sodic lakes with the exclusion of any kind of pollution.

 

  
Photo: Because of the nearness of the town, the quantity of illegally dumped waste is significant.
The elimination of them is the task of the project. (Photo: János Oláh)

 

In 2009: We have started the elimination of waste. In this year we managed to collect and transport a considerable quantity of communal waste from the project site.

 

Removed waste from the project site in 2009

 

 

Sites within the project area

Total quantity on the project site

Removed invasive plants and waste
from the project area in 2009

Magdolna-puszta

 

 

Plastic garbage

12m³

6m³ (by volunteers)

Other material (concrete, soil, bricks etc.)

22m³

-

 

 

 

Nagy-szik

 

 

Plastic garbage

14m³

-

Other waste material (concrete, soil, bricks etc.)

1740m³

-

 

 

In 2010: The unusually high precipitation inhibited also this action but with the help of volunteers we collected all the plastic garbage along the Madgolna-ér and around the clay-pits in late autumn (mainly brought in by the flooding).

 

Removed waste from the project site in 2010

 

 

Sites within the project area

Total quantity on the project site

Removed waste from the project area in 2010

Magdolna-puszta

 

 

Plastic garbage

12m³

-

Other material (concrete, soil, bricks etc.)

22m³

-

 

 

 

Nagy-szik

 

 

Plastic garbage

14m³

10m³

Other waste material (concrete, soil, bricks etc.)

1740m³

-

 

In 2011: The communal waste was collected from most of the project site so the landscape value greatly increased. By the help of volunteers plastic garbage was removed from the project site 2011 again. When the field works will take place we will remove all waste material (concrete, soil, bricks etc.) from the project site.

 

Removed waste from the project site in 2011

 

Sites within the project area

Total quantity on the project site

Removed waste from the project area in 2011

Magdolna-puszta

 

 

Plastic garbage

12m³

2m³

Other material (concrete, soil, bricks etc.)

22m³

-

 

 

 

Nagy-szik

 

 

Plastic garbage

14m³

4m³

Other waste material (concrete, soil, bricks etc.)

1740m³

40 m³

 

 

  
Picture: Volunteers collecting garbage from the project site (Photo: Árpád Ecsedi)

 

In 2012: The intended target of the action has been 95% achieved as following the communal waste collected previously most of the other waste was also collected in 2012 while carrying out the machinery field works. The landscape value greatly increased now. For the summary (2009-2012) of the elimination of illegal waste dumps and communal waste see table below.

 

Sites within the project area

Total quantity on the project site (estimation)

Removed in 2009

Removed in 2010

Removed in 2011

Removed in 2012

Magdolna-puszta

 

 

 

 

 

Plastic garbage

12m³

6 m³ (by volunteers)

2 m³ (by volunteers)

2 m³ (by volunteers)

2 m³ (by volunteers)

Other material (concrete, soil, bricks etc.)

22m³

-

-

-

-

 

 

 

 

 

 

Nagy-szik

 

 

 

 

 

Waste:

 

 

 

 

 

Plastic garbage

14m³

-

10 m³

4 m³

 

Other waste material (concrete, soil, bricks etc.)

1740m³

-

-

40 m³

1700 m³

 

2013: The plans and the intended target of the action has been 100% achieved, which are summarized in the table below.

 

Table: Removed waste from the project site (2009-2013)

Sites within the project area Total quantity
at the beginning of the project (estimated)
Removed in 2009 Removed in 2010 Removed in 2011 Removed in 2012 Removed
In 2013
TOTAL removed until the end of the project
Magdolna-puszta              
Plastic garbage 12 m³ 6 m³ 2 m³ 2 m³ 2 m³ 1 m³ 13 m³
Other material (concrete, soil, bricks etc.) 22 m³           25 m³   25 m³
               
Nagy-szik              
Plastic garbage 14m³   10 m³ 4 m³   11 m³ 25 m³
Other waste material (concrete, soil, bricks etc.) 1740m³     40 m³ 1700 m³   1740 m³