ACTION: C.6:
Elimination of illegal waste dumps, transportation of communal waste off the site.
The aim of the action is reaching and keeping an ecologically stable condition of sodic lakes with the exclusion of any kind of pollution.
Photo: Because of the nearness of the town, the quantity of illegally dumped waste is significant.
The elimination of them is the task of the project. (Photo: János Oláh)
In 2009: We have started the elimination of waste. In this year we managed to collect and transport a considerable quantity of communal waste from the project site.
Removed waste from the project site in 2009
Sites within the project area |
Total quantity on the project site |
Removed invasive plants and waste |
Magdolna-puszta |
|
|
Plastic garbage |
12m³ |
6m³ (by volunteers) |
Other material (concrete, soil, bricks etc.) |
22m³ |
- |
|
|
|
Nagy-szik |
|
|
Plastic garbage |
14m³ |
- |
Other waste material (concrete, soil, bricks etc.) |
1740m³ |
- |
In 2010: The unusually high precipitation inhibited also this action but with the help of volunteers we collected all the plastic garbage along the Madgolna-ér and around the clay-pits in late autumn (mainly brought in by the flooding).
Removed waste from the project site in 2010
Sites within the project area |
Total quantity on the project site |
Removed waste from the project area in 2010 |
Magdolna-puszta |
|
|
Plastic garbage |
12m³ |
- |
Other material (concrete, soil, bricks etc.) |
22m³ |
- |
|
|
|
Nagy-szik |
|
|
Plastic garbage |
14m³ |
10m³ |
Other waste material (concrete, soil, bricks etc.) |
1740m³ |
- |
In 2011: The communal waste was collected from most of the project site so the landscape value greatly increased. By the help of volunteers plastic garbage was removed from the project site 2011 again. When the field works will take place we will remove all waste material (concrete, soil, bricks etc.) from the project site.
Removed waste from the project site in 2011
Sites within the project area |
Total quantity on the project site |
Removed waste from the project area in 2011 |
Magdolna-puszta |
|
|
Plastic garbage |
12m³ |
2m³ |
Other material (concrete, soil, bricks etc.) |
22m³ |
- |
|
|
|
Nagy-szik |
|
|
Plastic garbage |
14m³ |
4m³ |
Other waste material (concrete, soil, bricks etc.) |
1740m³ |
40 m³ |
Picture: Volunteers collecting garbage from the project site (Photo: Árpád Ecsedi)
In 2012: The intended target of the action has been 95% achieved as following the communal waste collected previously most of the other waste was also collected in 2012 while carrying out the machinery field works. The landscape value greatly increased now. For the summary (2009-2012) of the elimination of illegal waste dumps and communal waste see table below.
Sites within the project area |
Total quantity on the project site (estimation) |
Removed in 2009 |
Removed in 2010 |
Removed in 2011 |
Removed in 2012 |
Magdolna-puszta |
|
|
|
|
|
Plastic garbage |
12m³ |
6 m³ (by volunteers) |
2 m³ (by volunteers) |
2 m³ (by volunteers) |
2 m³ (by volunteers) |
Other material (concrete, soil, bricks etc.) |
22m³ |
- |
- |
- |
- |
|
|
|
|
|
|
Nagy-szik |
|
|
|
|
|
Waste: |
|
|
|
|
|
Plastic garbage |
14m³ |
- |
10 m³ |
4 m³ |
|
Other waste material (concrete, soil, bricks etc.) |
1740m³ |
- |
- |
40 m³ |
1700 m³ |
2013: The plans and the intended target of the action has been 100% achieved, which are summarized in the table below.
Table: Removed waste from the project site (2009-2013)
Sites within the project area |
Total quantity at the beginning of the project (estimated) |
Removed in 2009 | Removed in 2010 | Removed in 2011 | Removed in 2012 |
Removed In 2013 |
TOTAL removed until the end of the project |
Magdolna-puszta | |||||||
Plastic garbage | 12 m³ | 6 m³ | 2 m³ | 2 m³ | 2 m³ | 1 m³ | 13 m³ |
Other material (concrete, soil, bricks etc.) | 22 m³ | 25 m³ | 25 m³ | ||||
Nagy-szik | |||||||
Plastic garbage | 14m³ | 10 m³ | 4 m³ | 11 m³ | 25 m³ | ||
Other waste material (concrete, soil, bricks etc.) | 1740m³ | 40 m³ | 1700 m³ | 1740 m³ |